Hidden Groves diary

2022

January–March

Fire sprinklers, water and sewer trenches, insulation and drywall in the Cottage. We moved in at the end of March, even though the kitchen was still a work in progress.

January–March 2022 at Hidden GrovesJanuary–March 2022 at Hidden Groves

April–June

A flush toilet, kitchen sink, drawers, stove and mini-split. Groundbreaking began on the Back House in June.

July–August

Forms, stem walls, sewer, water lines, radiant tubing and the Back House slab.

July–August 2022 at Hidden Groves

September–October

Framing, rafters, windows, a red exterior and shingles on the Back House.

September–October 2022 at Hidden Groves

November

After a long fire-sprinkler inspection delay, we returned to insulating and finishing the Cottage.